Attn: Members on Load Control — Adams Electric Cooperative will be load controlling Wednesday, September 2 from 4:00-7:00 p.m. and Thursday, September 3 from 4:00-7:00 p.m. All central air conditioner compressors are cycled a maximum of 15 minutes “on” and a maximum of 15 minutes “off”, but the fan is allowed to run at all times. All water heaters will be turned “off” for the entire interruption. This control pertains to members on the CHC, CAC and CWH rates. If you have any questions regarding the interruptions, call Adams Electric at (800) 232-4797.