The Cooperative is conducting load control Wednesday, September 11, from 2-6 pm. All central air conditioner compressors will be cycled a maximum of 15 minutes on and a maximum of 15 minutes off but the fan will continue to run at alltimes. Water heaters will be turned off during these time frames. If you have any questions, please call (800) 232-4797.