Attn: Members on Load Control — Adams Electric Cooperative will be load controlling Tuesday, June 3 from 4:00-6:00 p.m. All water heaters on Controlled Heating and Cooling (CHC) and Controlled Water Heating (CWH) will be turned “off” for the entire interruption period. If you have any questions regarding the interruptions, call Adams Electric at (800) 232-4797.